Building Pyramids Through Team Work

Standard

I am lucky enough to work with some amazing kids. They vary in socio-economic backgrounds, cultural backgrounds, social development, and academic ability levels. There are twenty-eight mainstreamed students in my class, and two students that visit my classroom through an inclusion program.

In order to keep my classroom running smoothly, I need to incorporate team building and class building activities. Many of my ideas stem from Kagan Classbuilding Cooperative Learning Activities and Kagan Teambuilding Cooperative Learning Structures.

My class is set up in groups of four. Each group is assigned a different color. Within each group, each student is assigned a number: 1, 2, 3, or 4. I use these colors and numbers to help set up learning structures and jobs.

This week’s teambuilding challenge came from Science Gal, and she got the activity from a FOSS training.

Each team needs: 6 plastic cups, 1 rubber band, and four strings (each 24 inches long)

The challenge: Each team moves cups from a “wall of cups” (length of 3 cups, height of 2 cups) to a “pyramid of cups” (3 on the bottom, 2 in the middle, 1 on top).

All of my teams were able to accomplish the task. Early finishers were given the task of putting the cups back to their original state. They had a blast!

download

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s